One Missing Dimension
Review dimensions from an execution perspective, not only a design perspective.
-

Factory Ready, Site Not Ready
In prefabricated (IBS) construction, success depends on factory readiness and site readiness together.
-

Crane Waiting Time
In prefabricated (IBS) projects, crane time is expensive and transport is part of construction. Coordinate deliveries tightly with installation.
-

One Missing Opening, One Costly Change
Review shop drawings carefully before fabrication. Mistakes are cheaper on paper than in the factory.
-

Site Readiness Matters
Before confirming delivery dates, verify site readiness with a documented checklist. Poor coordination quickly turns into extra cost.