A drawing was approved, but one critical dimension was not verified. The issue was discovered during installation. Lesson learned: Always review dimensions from an execution perspective, not only a design perspective. #SiteEngineering...
All drawings were approved, but dimensions on site did not match reality. Lesson learned: Site verification should never be skipped. #SiteEngineering #LessonsLearned
A wall panel required modification after production because an opening location was overlooked during the shop drawing review. Lesson learned: Ten minutes spent reviewing a drawing can save days of rework in production and installation. #IBS...
During wall panel installation, a service opening was found in the wrong location. The issue seemed small on drawings but required modification after production. Lesson learned: Review shop drawings carefully before fabrication. Mistakes are cheaper on paper than in...